Pengenalan singkat tentang pencapaian instalasi mesin diesel PT. Instalasi Diesel Indonesia.
NO. | Project name | Time | Model | Responsible for project content |
1 |
Shenzhen Guangming Xintai Technology Co., Ltd. |
2008.07 | 2×MAK |
boiler replacement. muffler production, replacement |
2 |
Shunde Huashun power plant |
2009.04 | 5×Sulzer16ZAV40S | Demolition |
3 |
Guanlan Baochang power plant |
2009.06 |
4×Sulzer16ZAV40; S2×3MW Steam turbine unit |
Demolition |
4 | Yunfu power plant | 2009.06 | 4×MAN58/64 | Demolition |
5 | Foshan power plant | 2009.07 | 2×MAN58/64 | Demolition |
6 | Fuzhou power plant | 2009.09 | 2×Sulzer16ZAV40S | Demolition |
7 |
Bangladesh Chittagong power plant |
2009.09 | 6×MAN58/64 |
Design, consultancy, matching, installation and commissioning |
8 |
Lhasa Huaneng transition power supply |
2009.10 | 9×Sulzer16ZAV40S |
Design, consultancy, matching, installation and commissioning |
9 | Shenzhen power plant. | 2010.01 | 2×MAN14V40/45 | Demolition |
10 |
Pakistan Lahore power plant |
2010.04 |
24×Sulzer16ZAV40; S4X3MW Steam turbine |
Design, consultancy, matching, installation and commissioning |
11 |
Lhasa Tibet thermal power plant |
2010.06 | 15×Sulzer16ZAV40S |
Auxiliary machine, electrical overhaul |
12 | Indonesia Bandar Lampung power plant | 2010.10 | 2×Sulzer 16ZAV40S |
Design, construction, installation and commissioning |
13 | Shunde, Ronggui | 2011.03 | Reconstruction of Shunde power grid | Installation and debugging |
14 |
Xing tan Garbage power plant |
2011.05 | 12MW Steam turbine unit | Repair |
15 | Lhasa Tibet thermal power plant | 2011.06 | 15×Sulzer16ZAV40S |
Auxiliary machine, electrical overhaul |
16 | Xinhui silver Chau paper | 2011.05 | 5000m3/d Sewage treatment works | Installation and debugging |
17 | Uganda TORORO power plant | 2012.02 | 6×Sulzer 16ZAV40S |
Boiler matching, manufacturing and installation |
18 | Indonesia Makassar power plant | 2012.03 |
1×16ZAV40S; 6×Deutz BV16M640 |
Design, matching and installation |
19 | Ningbo Xinyu shipyard | 2012.06 | 2×MAN14V 40/45 |
Installation and commissioning consultancy services |
20 |
Lhasa Tibet thermal power plant |
2012.08 | 15×Sulzer16ZAV40S |
Maintenance of auxiliary engine and lubricating oil unit |
21 | Sand power plant in Nanhai sand mouth | 2013.05 | 2x9E Gas turbine |
Demolition of boiler chimney, disassembly of auxiliary engine |
22 | Guangdong Guangyao group | 2013.06 | Solar power project |
Auxiliary design, matching, production and installation |
23 | Waste power plant | 2013.08 |
12MW Steam turbine unit |
Repair |
24 |
Philippines BACLO power plant |
2014.03 | 5x14ZAV40/4;830MWPower plant project |
Engineering design, engineering and technical consultancy work is under way |
25 |
Bangladesh CCCE Dhaka power plant dual fuel project |
2014.06 |
9xMAN18v48/6090MW Power plant project |
Auxiliary matching, installation and debugging |
26 |
Reconstruction project of 1# flue of Shunde five sand and heat power plant |
2015.03 |
Disassembly, fabrication, installation |
|
27 |
Repair project of coal handling system in Shunde five thermal power plant |
2015.05 |
Disassembly, installation, corrosion protection |
|
28 |
Bangladesh CCCE in Chittagong power plant |
2016.09 |
Installation and commissioning of oil to gas project |
|
29 |
Installation of Sinoma 230MW power plant in Gezhouba Dam, Angola |
2016.08 |
3 sets of modern Korean 18V32/40 units |
Installation and debugging |
30 |
National nuclear power tower 16MW installation |
2017-02 |
4 sets of wrtsil 32/40 units |
Disassembly, installation and commissioning. |